Summary for Test 2022-12-09-21-1
Test performed: CTM 231-March 2013Project Information
Project Identifiers | Project ID: 214451 DEA: 07303704 EFIS: 0714000035 |
---|---|
DIST-CO-RTE-PM | 07-LA-101-8.0/27.3 |
Award Date | 12/19/2019 |
Closeout Date | 05/07/2024 |
Work Description | REPLACE CONCRETE BARRIERS. |
Location Description | THE CITY AND COUNTY OF LOS ANGELES FROM PILGRIMAGE OVERCROSSING TO VALLEY CIRCLE BOULEVARD OVERCROSSING |
QA Service Level | 1 (Verified on 08/12/2020) |
Sample Information
Sample Taken Date | 12/09/2022 | Sample Unique Key | 21 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 12/09/2022 |
Sample type | Quality Assurance | A brief description of the sample | Subgrade |
The quantity of what the sample constitutes | 2550 Square Feet | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Manuel | Last name of sampler or witnessed by | Uy |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 22-3177 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | n/a | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | n/a |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | CTM 231 Test Holes | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/8 inch | |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2022-12-09-21
DIME Test ID: 2022-12-09-21-1
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2022-12-14
Test Results
Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Calculated
Tester's full name: Manuel Uy
Date of test: 12/09/2022
Sum of Count or Density: 16436.00 g/cc
Average of Count or Density: 5479.00 g/cc
Sum of Moisture Count: 1084.00 g/cc
Average of Moisture Count: 361.00 g/cc
Count Ratio Density: 2.07
Count Ratio Moisture: 0.27
Calculated Percent Relative Compaction: 94.7 %
Reported Percent Relative Compaction: 95 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 12/14/2022 ✔