Sample Record

Owner Lab

  • Alta Vista Solutions - Whittier

DIME Sample ID 2022-12-09-21

Project Information

Project IdentifiersProject ID: 214451
DEA: 07303704
EFIS: 0714000035
DIST-CO-RTE-PM07-LA-101-8.0/27.3
Award Date12/19/2019
Closeout DateNot set
Work DescriptionREPLACE CONCRETE BARRIERS.
Location DescriptionTHE CITY AND COUNTY OF LOS ANGELES FROM PILGRIMAGE OVERCROSSING TO VALLEY CIRCLE BOULEVARD OVERCROSSING
QA Service Level1 (Verified on 08/12/2020)

Sample Information

Sample Taken Date12/09/2022 Sample Unique Key21
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testing12/09/2022
Sample typeQuality Assurance A brief description of the sampleSubgrade
The quantity of what the sample constitutes2550 Square Feet From where was the sample collectedJob Site
First name of sampler or witnessed byManuel Last name of sampler or witnessed byUy
Title of sampler Telephone number of sampler
Laboratory sample identification22-3177 Linked DIME Sample ID
The fabricator/manufacturer/facility namen/a Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)n/a
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedCTM 231 Test Holes
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/8 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2022-12-09-21-1CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear GagesManuel Uy, Alta Vista Solutions - Whittier12/09/2022Treyvon GriffinBryant
Yes
12/14/2022
2022-12-09-21-2CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and AggregatesManuel Uy, Alta Vista Solutions - Whittier12/09/2022Treyvon GriffinBryant
Yes
12/14/2022

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2022-12-09-21-1 CTM 231-March 2013 (Verified)
DIME Test ID: 2022-12-09-21-2 CTM 216-June 2011 (Verified)