Summary for Test 2022-11-15-16-2
Test performed: CTM 231-March 2013Project Information
Project Identifiers | Project ID: 214993 DEA: 051F5004 EFIS: 0514000003 |
---|---|
DIST-CO-RTE-PM | 05-SB-101,135-70.6/71.2;0.1 |
Award Date | 11/17/2020 |
Closeout Date | 01/11/2024 |
Work Description | CONSTRUCT CONCRETE BRIDGE, BRIDGE REMOVAL, COLD PLANE, PLACE HMA. |
Location Description | SANTA BARBARA COUNTY AT LOS ALAMOS ON ROUTE 101 FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF ROUTE 101/135 SEPARATION AND ON ROUTE 135 AT ROUTE 101/135 SEPARATION |
QA Service Level | 1 (Verified on 09/03/2020) |
Sample Information
Sample Taken Date | 11/15/2022 | Sample Unique Key | 16 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/15/2022 |
Sample type | Quality Assurance | A brief description of the sample | Embankment soil for shoulder construction |
The quantity of what the sample constitutes | Tons | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Isaac | Last name of sampler or witnessed by | Gleffe |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Calportland | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
---|---|---|---|
The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | Jobsite Subgrade | |
Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2022-11-15-16
DIME Test ID: 2022-11-15-16-2
Testing Lab: CT D05 - Santa Maria Field Laboratory
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2022-11-21
Test Results
Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Calculated
Tester's full name: Isaac Gleffe
Date of test: 11/16/2022
Sum of Count or Density: 3135.00 g/cc
Average of Count or Density: 1045.00 g/cc
Sum of Moisture Count: 536.00 g/cc
Average of Moisture Count: 179.00 g/cc
Count Ratio Density: 0.60
Count Ratio Moisture: 0.26
Calculated Percent Relative Compaction: 96.3 %
Reported Percent Relative Compaction: 96 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 11/21/2022 ✔