Summary for Test 2022-08-18-92-5
Test performed: CTM 504-June 2010Project Information
Project Identifiers | Project ID: 213707 DEA: 081C38U4 EFIS: 0817000196 |
---|---|
DIST-CO-RTE-PM | 08-RIV-10-6.7/R25.1 |
Award Date | 11/26/2019 |
Closeout Date | 11/01/2023 |
Work Description | Remove concrete pavement and base, and place HMA and JPCP |
Location Description | ROUTE 10/60 SEPARATION IN BEAUMONT TO ROUTE 10/111 SEPARATION NEAR CABAZON. |
QA Service Level | 1 (Verified on 01/09/2020) |
Sample Information
Sample Taken Date | 08/18/2022 | Sample Unique Key | 92 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/19/2022 |
Sample type | Quality Assurance | A brief description of the sample | JPCP beams |
The quantity of what the sample constitutes | 4 Beams | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Nathan Ogbasellasie / | Last name of sampler or witnessed by | James Burton |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 220JA1, 220JA2, 220JB1, 220JB2 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Coffman Specialties, Inc | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | 1906-2 |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 70 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Wheel Loader Bucket | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2022-08-18-92
DIME Test ID: 2022-08-18-92-5
Testing Lab: CT D08 - Fontana Field Testing Laboratory
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2022-11-01
Test Results
Input Type: Calculated
Tester's full name: James Burton
Date of test: 08/18/2022
Air Content: 4 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 11/1/2022 ✔