Summary for Test 2022-09-09-8-4

Test performed: SMTL BILST-06

Project Information

Project IdentifiersProject ID: 993779
DEA: 051K7204
EFIS: 0519000001
DIST-CO-RTE-PM05-SLO-41-3.1
Award Date06/30/2022
Closeout DateNot set
Work DescriptionCONSTRUCT SOLDIER PILE RETAINING WALL.
Location DescriptionSAN LUIS OBISPO COUNTY NEAR MORRO BAY AT 3.1 MILES NORTH OF ROUTE 1/41 SEPARATION
QA Service Level1 (Verified on 05/02/2022)

Sample Information

Sample Taken Date09/09/2022 Sample Unique Key8
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/09/2022
Sample typeQuality Assurance A brief description of the sampleBearing Pad
The quantity of what the sample constitutes1 From where was the sample collectedSupplier
First name of sampler or witnessed byJason Last name of sampler or witnessed byGramlick
Title of sampler Telephone number of sampler5104537830
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameGRT Rubber TEchnologies Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) FormB-3-900-22 Structure unique identifier
Structure name

Material Information

Material TypeSMTL TM1 - Elastomeric Bearing Pad Mfg. Lot Number(s)BP06428K
Material/Compound/Elastomer ID00000 Samples Representing1
Description (size).250x12x12 Comments
Description (Number of Shims)0 Type of Bearing PadPlain
Description (Thickness of Shims)NA Manufacturer(s)GRT Rubber
Batch Number41-1256-20

Test Details

DIME Sample ID: 2022-09-09-8
DIME Test ID: 2022-09-09-8-4
Testing Lab: CT HQ - Sacramento Chemistry Laboratory
Test Method: SMTL BILST-06: (Neoprene Verification) Bilstein Test
Test Release Date: 2022-10-06

Test Results


Input Type: Calculated
Tester's full name: Mariano Pontillas
Date of test: 10/06/2022
Result: Pass
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 10/6/2022