Project Details
This page displays current information for project DEA: 051K7204.
Project Information
Project Identifiers | Project ID: 993779 DEA: 051K7204 EFIS: 0519000001 |
---|---|
DIST-CO-RTE-PM | 05-SLO-41-3.1 |
Award Date | 06/30/2022 |
Closeout Date | 11/25/2024 |
Work Description | CONSTRUCT SOLDIER PILE RETAINING WALL. |
Location Description | SAN LUIS OBISPO COUNTY NEAR MORRO BAY AT 3.1 MILES NORTH OF ROUTE 1/41 SEPARATION |
QA Service Level | 1 (Verified on 05/02/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Matthew.Tallone@dot.ca.gov | Matthew Tallone | Resident Engineer | Caltrans RE DB |
Alex.Martinez@dot.ca.gov | Alex Martinez | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-4 of 4 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-10-04-7 | 10/04/2022 | 10/11/2022 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
2022-09-09-8 | 09/09/2022 | 09/09/2022 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
2022-08-12-30 | 08/12/2022 | 08/16/2022 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
2022-08-12-9 | 08/12/2022 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods