Summary for Test 2022-08-30-29-4
Test performed: AASHTO T313-22Project Information
Project Identifiers | Project ID: 993193 DEA: 031H18U4 EFIS: 0321000106 |
---|---|
DIST-CO-RTE-PM | 03-NEV-80-13.0/16.5 |
Award Date | 11/04/2021 |
Closeout Date | 12/14/2023 |
Work Description | ROADWAY EXCAVATION, JPCP AND FURNISH POLYESTER CONCRETE OVERLAY. |
Location Description | NEVADA COUNTY IN AND NEAR TRUCKEE FROM 0.2 MILE WEST OF DONNER PARK OVERCROSSING TO ROUTE 89/267 SEPARATION |
QA Service Level | 1 (Verified on 08/23/2021) |
Sample Information
Sample Taken Date | 08/30/2022 | Sample Unique Key | 29 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/31/2022 |
Sample type | Quality Control | A brief description of the sample | 3/4" HMA w/ 15% RAP Oil, 64-28 |
The quantity of what the sample constitutes | 1 Oil Can | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Dustan | Last name of sampler or witnessed by | Kliethermes |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Martis Valley | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 64-28 |
---|---|---|---|
Modified | No | Lot number | |
Sublot number | Tank number | ||
Time of sample | HMA Supplier | ||
Certified Asphalt Supplier | Pacific Northwest Oil - Stockton CA | Multigrade | Yes |
Multigrade Type | PG 64-28 / PG 64-16 / PG 64-10 | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2022-08-30-29
DIME Test ID: 2022-08-30-29-4
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T313-22: Standard Method of Test for Determining the Flexural Creep Stiffness of Asphalt Binder Using the Bending Beam Rheometer (BBR)
Test Release Date: 2022-09-13
Test Results
Input Type: Measured
Tester's full name: Erika Gonzalez
Date of test: 09/09/2022
Minimum test bath temperature at 240 s: -18.0 C
Maximum test bath temperature at 240 s: -18.0 C
Time of test load application: no data
File name of test data: no data
Time beam in bath: no data
Time test started: no data
Flags issued by software during test: no data
Correlation coefficient (R²): 0
Regression coefficient a: no data
Regression coefficient b: no data
Regression coefficient c: no data
Load at time 0.0: 0.0 mN
Deflection at time 0.0 s: 0.000 µm
Load at time 0.5 s: 0.0 mN
Deflection at time 0.5 s: 0.000 µm
Load at 60.0 s: 0.0 mN
Beam deflection 60.0 s: 0.000 µm
Measured Stiffness Modulus 60.0 s: 267.000 MPa
Estimated Stiffness Modulus 60.0 s: 267.000 MPa
Difference between stiffness moduli 60.0 s: 0 %
Estimated m-value 60.0 s: 0.315
General comments (publicly viewable) (Max 1000 characters): BBR
Test was verified on 9/13/2022 ✔