Project Details
This page displays current information for project DEA: 031H18U4.
Project Information
Project Identifiers | Project ID: 993193 DEA: 031H18U4 EFIS: 0321000106 |
---|---|
DIST-CO-RTE-PM | 03-NEV-80-13.0/16.5 |
Award Date | 11/04/2021 |
Closeout Date | 12/14/2023 |
Work Description | ROADWAY EXCAVATION, JPCP AND FURNISH POLYESTER CONCRETE OVERLAY. |
Location Description | NEVADA COUNTY IN AND NEAR TRUCKEE FROM 0.2 MILE WEST OF DONNER PARK OVERCROSSING TO ROUTE 89/267 SEPARATION |
QA Service Level | 1 (Verified on 08/23/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
randy.stellhorn@dot.ca.gov | Randy Stellhorn | Resident Engineer | Caltrans RE DB |
carl.c.anderson@dot.ca.gov | Carl Anderson | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 43 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-10-28-17 | 10/28/2022 | 10/31/2022 | Quality Assurance | Concrete | View |
2022-10-18-33 | 10/18/2022 | 10/19/2022 | Quality Assurance | Concrete | View |
2022-10-14-32 | 10/14/2022 | 10/18/2022 | Quality Assurance | Concrete | View |
2022-10-14-31 | 10/14/2022 | 10/18/2022 | Quality Assurance | Concrete | View |
2022-10-05-60 | 10/05/2022 | 10/13/2022 | Department Acceptance | Asphalt Binder | View |
2022-10-05-49 | 10/05/2022 | 10/13/2022 | Quality Control | Hot Mix Asphalt | View |
2022-10-04-45 | 10/04/2022 | 10/04/2022 | Quality Control | Hot Mix Asphalt | View |
2022-09-24-19 | 09/24/2022 | 09/24/2022 | Quality Control | Hot Mix Asphalt | View |
2022-10-05-48 | 10/05/2022 | 10/05/2022 | Quality Control | Asphalt Binder | View |
2022-10-07-28 | 10/07/2022 | 10/11/2022 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods