Summary for Test 2020-09-01-21-4
Test performed: ASTM C1038-14bProject Information
Project Identifiers | Project ID: 8801 DEA: AML-CEM EFIS: AML-CEM |
---|---|
DIST-CO-RTE-PM | 59--- |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Special project for Cementitious Materials for use in Concrete Authorized Material List (AML) |
Location Description | Not set |
QA Service Level | NOT VERIFIED |
Sample Information
Sample Taken Date | 09/01/2020 | Sample Unique Key | 21 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/01/2020 |
Sample type | Proficiency | A brief description of the sample | pozzolan |
The quantity of what the sample constitutes | 1 bag | From where was the sample collected | Other |
First name of sampler or witnessed by | na | Last name of sampler or witnessed by | na |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | CM208068 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | CCRL | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Cementitious | Brand | CCRL |
---|---|---|---|
Mill | CCRL Pozzolan | Type of Cementitious Material | Class F or N Flyash |
Test Details
DIME Sample ID: 2020-09-01-21
DIME Test ID: 2020-09-01-21-4
Testing Lab: CT HQ - Sacramento Cement Testing Laboratory
Test Method: ASTM C1038-14b: Standard Test Method for Expansion of Hydraulic Cement Mortar Bars Stored in Water (Cement Mortar Bars)
Test Release Date: 2022-07-11
Test Results
Input Type: Measured
Tester's full name: Spencer Adams
Date of test: 09/16/2020
Specimen A Initial measurement at 24 hours: 0.2596 in
Specimen B Initial measurement at 24 hours: 0.2663 in
Specimen C Initial measurement at 24 hours: 0.2924 in
Specimen D Initial measurement at 24 hours: 0.0084 in
Specimen A Final measurement at 14 days: 0.2511 in
Specimen B Final measurement at 14 days: 0.2578 in
Specimen C Final measurement at 14 days: 0.2841 in
Specimen D Final measurement at 14 days: 0 in
The average length of change of the four specimens: -0.084 %
General comments (publicly viewable) (Max 1000 characters): only 3 bars fabricated. Specimen D numbers are chosen to make the average correct.
Test was verified on 7/11/2022 ✔