Summary for Test 2016-05-24-5-1

Test performed: CTM 670-December 2013

Project Information

Project IdentifiersProject ID: 209217
DEA: 080F5404
EFIS: 0800000136
COOP: 081468
DIST-CO-RTE-PM08-RIV-91,15-0.0/13.04, 35.64/45.14
Award Date09/09/2013
Closeout Date09/20/2023
Work DescriptionSR-91 Corridor Improvement Project: Develop approx. 8 miles of tolled express lanes and related improvements within SR 91 between the Riverside/Orange County line and I-15, including transition areas.
Location Description08-RIV-91-0.0/13.04; 12-ORA-91-R14.43/R18.91; 08-RIV-15-35.64/45.14
QA Service Level1 (Verified on 08/07/2014)

Sample Information

Sample Taken Date05/24/2016 Sample Unique Key5
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/26/2016
Sample typeQuality Assurance A brief description of the sampleBarsplice Zap Screwlok Coupler
The quantity of what the sample constitutes4 From where was the sample collectedJob Site
First name of sampler or witnessed byA Last name of sampler or witnessed bypetrov
Title of samplerUnknown Telephone number of samplerUnknown
Laboratory sample identificationUnknown Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameBarSplice Gerdau Transportation Laboratory (TL) NumberUnknown
Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateService Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerGerdau
Coupler ManufacturerBarsplice Intermediate Assembler or FabricatorUnknown
Rebar Size#11 Coupler ModelZap Screwlok
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop DiameterUnknown Rebar Hoop FabricatorUnknown
Coupler Component Heat/Lot Number(s)493089 492009 Rebar Heat Number(s)6502355902
Rebar Size 2 #11 Coupler Unique IDNot set

Test Details

DIME Sample ID: 2016-05-24-5
DIME Test ID: 2016-05-24-5-1
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Test Release Date: 2016-05-27

Test Results


Number of Samples: 1
Input Type: Measured
Tester's full name: Fred
Date of test: 05/27/2016
UTM: 2000KIP
Halo ID: Big
Temperature: 72 F
NumSampleMfg. Lot Number(s)SizeArea (sqin)Slip (inch)Peak Load (lbf)Peak Stress (psi)CommentsTested By
111#11/36mm1.56.00314330191860Service SpliceFred

General comments (publicly viewable) (Max 1000 characters): Service Splice
Test Graph
WARNING: No graph data imported from Instron machine.

Test was verified on 5/27/2016