Summary for Test 2022-02-11-7-2
Test performed: CTM 216-June 2011Project Information
Project Identifiers | Project ID: 212112 DEA: 080C2514 EFIS: 0816000076 COOP: 081645 |
---|---|
DIST-CO-RTE-PM | 08-SBD-10-0.0/13.2 |
Award Date | 06/06/2018 |
Closeout Date | Not set |
Work Description | Design-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes |
Location Description | LA/SBD County Line to PM 13.2 near I-15 |
QA Service Level | 1 (Verified on 10/16/2019) |
Sample Information
Sample Taken Date | 02/11/2022 | Sample Unique Key | 7 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/11/2022 |
Sample type | Quality Assurance | A brief description of the sample | Soil |
The quantity of what the sample constitutes | <2000 sqy | From where was the sample collected | Job Site |
First name of sampler or witnessed by | omar | Last name of sampler or witnessed by | G |
Title of sampler | TET | Telephone number of sampler | |
Laboratory sample identification | 02112022 TEST 01 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | CTM 231 TEST LOCATION | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Soil | The fabricator's/manufacturer's product name for the sample | kenedy eubany |
---|---|---|---|
The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | AT THE JOB SITE | |
Where the material sample would have been placed if not sampled |
Combined Gradation Report Information
Combined Gradation Report Id | Bin Index | Dime Test Id |
---|---|---|
No assigned tests for this sample. |
Test Details
DIME Sample ID: 2022-02-11-7
DIME Test ID: 2022-02-11-7-2
Testing Lab: CT D08 - Barstow Field Laboratory 1
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2022-02-16
Test Results
Is oversize material: No
Input Type: Measured
Tester's full name: omar G G
Date of test: 02/11/2022
In-place wet density: 2.13
Highest adjust wet density: 2.15
% Moisture: no data
Optimum Moisture: 1 %
Relative compaction: 99
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 2/16/2022 ✔