Summary for Test 2021-12-09-3-8

Test performed: CTM TEMP1-16

Project Information

Project IdentifiersProject ID: 214993
DEA: 051F5004
EFIS: 0514000003
DIST-CO-RTE-PM05-SB-101,135-70.6/71.2;0.1
Award Date11/17/2020
Closeout Date01/11/2024
Work DescriptionCONSTRUCT CONCRETE BRIDGE, BRIDGE REMOVAL, COLD PLANE, PLACE HMA.
Location DescriptionSANTA BARBARA COUNTY AT LOS ALAMOS ON ROUTE 101 FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF ROUTE 101/135 SEPARATION AND ON ROUTE 135 AT ROUTE 101/135 SEPARATION
QA Service Level1 (Verified on 09/03/2020)

Sample Information

Sample Taken Date12/09/2021 Sample Unique Key3
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/10/2021
Sample typeQuality Control A brief description of the sample4x8 concrete cylinders
The quantity of what the sample constitutes58 CY From where was the sample collectedFabricator
First name of sampler or witnessed byStephen Last name of sampler or witnessed byHaynes
Title of samplerQC Inspector Technician Telephone number of sampler9253317125
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameKIE-CON, INC Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design numberK7010-705 CPO R3
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected112969
Concrete batch plant The fabricator/manufacturer designation for the sample20-138 12/9/21
A detailed description of where the material sample was collectedConcrete sample from wheelbarrow Where the material sample would have been placed if not sampledG3 North Box Girder
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2021-12-09-3
DIME Test ID: 2021-12-09-3-8
Testing Lab: Kie-Con, Incorporated - Antioch
Test Method: CTM TEMP1-16: Test Method for Monitoring Precast Concrete Curing Temperature (Curing temperature)
Test Release Date: 2022-01-14

Test Results


Input Type: Calculated
Tester's full name: Stephen Haynes
Date of test: 12/09/2021
Precast Maximum Curing Temperature: 128.5 °F
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 1/14/2022