Summary for Test 2021-12-21-9-1
Test performed: CTM 231-March 2013Project Information
Project Identifiers | Project ID: 212112 DEA: 080C2514 EFIS: 0816000076 COOP: 081645 |
---|---|
DIST-CO-RTE-PM | 08-SBD-10-0.0/13.2 |
Award Date | 06/06/2018 |
Closeout Date | Not set |
Work Description | Design-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes |
Location Description | LA/SBD County Line to PM 13.2 near I-15 |
QA Service Level | 1 (Verified on 10/16/2019) |
Sample Information
Sample Taken Date | 12/21/2021 | Sample Unique Key | 9 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/21/2021 |
Sample type | Quality Assurance | A brief description of the sample | Soil |
The quantity of what the sample constitutes | <2000 sqy | From where was the sample collected | Job Site |
First name of sampler or witnessed by | omar | Last name of sampler or witnessed by | G |
Title of sampler | TET | Telephone number of sampler | |
Laboratory sample identification | 12212021 TEST 01 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | CTM 231 TEST LOCATION | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Soil | The fabricator's/manufacturer's product name for the sample | OMAR G |
---|---|---|---|
The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | AT THE JOB SITE | |
Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2021-12-21-9
DIME Test ID: 2021-12-21-9-1
Testing Lab: CT D08 - Barstow Field Laboratory 1
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2021-12-27
Test Results
Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: omar G G
Date of test: 12/21/2021
Gage No.: 30690
Test No.: 1
Nuclear By: omar G G
Non-Bias Plan No.: 1
Depth: 8
Material No.: CLASS II BASE/
Material Type: imported
Impact By: omar G G
Standard Count Density: 1738 g/cc
Count or Density 1: 1047 g/cc
Count or Density 2: 964 g/cc
Count or Density 3: 920 g/cc
Standard Count Moisture: 636 g/cc
Moisture Count 1: 115 g/cc
Moisture Count 2: 144 g/cc
Moisture Count 3: 131 g/cc
Sum of Count or Density: 2931.00 g/cc
Average of Count or Density: 977.00 g/cc
Sum of Moisture Count: 390.00 g/cc
Average of Moisture Count: 130.00 g/cc
Count Ratio Density: 0.56
Count Ratio Moisture: 0.20
Calculated Percent Relative Compaction: 98.1 %
Reported Percent Relative Compaction: 98 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 12/27/2021 ✔