Summary for Test 2021-08-20-53-7

Test performed: AASHTO T30-19
Warning: The test results shown on this page have been superseded and are invalid. This information is for reference only. Please click this link to view the corrected test.

Project Information

Project IdentifiersProject ID: 214114
DEA: 040A5394
EFIS: 0418000244
DIST-CO-RTE-PM04-SOL-80,12-11.4/12.8, 2.1/2.8
Award DateNot set
Closeout Date02/24/2023
Work DescriptionWiden EB SR-12 Connector, Construct 3 ramps & 2 box girder bridges, remove existing bridge, etc.
Location DescriptionI-80/I-680/Route 12 Interchange
QA Service Level1 (Verified on 04/23/2019)

Sample Information

Sample Taken Date08/20/2021 Sample Unique Key53
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testing08/20/2021
Sample typeVerification A brief description of the sample4 Bags of Mix Aggregates
The quantity of what the sample constitutes4 Bags From where was the sample collectedManufacturer
First name of sampler or witnessed byTarech CA Last name of sampler or witnessed byCA
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameSyar Indunsties Lake Herman Batch Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-48-0002::LAKE HERMAN QUARRY
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedSyar Vallejo
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1/2 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2021-08-20-53
DIME Test ID: 2021-08-20-53-7
Testing Lab: CT D04 - Hayward DME / District Laboratory
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2021-09-22

Test Results


Does this test use 1/4 sieve?: No
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: Nicholas Shelly
Date of test: 09/08/2021
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 99.2 %
Cumulative percent passing the #4 sieve: 74.8 %
Cumulative percent passing the #8 sieve: 52.9 %
Cumulative percent passing the #16 sieve: 39.1 %
Cumulative percent passing the #30 sieve: 29.9 %
Cumulative percent passing the #50 sieve: 22.3 %
Cumulative percent passing the #100 sieve: 14.7 %
Cumulative percent passing the #200 sieve: 11.1 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 9/22/2021