Summary for Test 2021-02-15-3-2
Test performed: CTM 670-December 2013Project Information
Project Identifiers | Project ID: 212112 DEA: 080C2514 EFIS: 0816000076 COOP: 081645 |
---|---|
DIST-CO-RTE-PM | 08-SBD-10-0.0/13.2 |
Award Date | 06/06/2018 |
Closeout Date | Not set |
Work Description | Design-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes |
Location Description | LA/SBD County Line to PM 13.2 near I-15 |
QA Service Level | 1 (Verified on 10/16/2019) |
Sample Information
Sample Taken Date | 02/15/2021 | Sample Unique Key | 3 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/05/2021 |
Sample type | Per Request | A brief description of the sample | #8 Bar Splice |
The quantity of what the sample constitutes | 21 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | George | Last name of sampler or witnessed by | Cleveland |
Title of sampler | Inspector | Telephone number of sampler | (909) 450-3211 |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | CMC Rebar | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Service | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Manufacturer | CMC Rebar |
Coupler Manufacturer | Bar Splice | Intermediate Assembler or Fabricator | |
Rebar Size | #8 | Coupler Model | Zap Screwlok Coupler Type 2 LL |
Coating Standards | Uncoated | Shape of Rebar | Straight |
Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
Coupler Component Heat/Lot Number(s) | MM20102404 | Rebar Heat Number(s) | 4102806 |
Rebar Size 2 | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2021-02-15-3
DIME Test ID: 2021-02-15-3-2
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2021-03-10
Test Results
Number of Samples Tested: 1
Input Type: Measured
Tester's full name: fsaylor
Date of test: 03/09/2021
UTM: 400kip
Temperature: 72.00 f
Halo ID:
Num | Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
---|---|---|---|---|---|---|---|---|---|---|
1 | 2 | No. 8/25mm | 1 | 0 | 0.79 | 82568 | 104516 | Service Splice | fsaylor |
General comments (publicly viewable) (Max 1000 characters): Service Splice
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.
Test was verified on 3/10/2021 ✔