Summary for Test 2021-01-18-4-5
Test performed: CTM 556-January 2018Project Information
Project Identifiers | Project ID: 213750 DEA: 120K0224 EFIS: 1214000097 |
---|---|
DIST-CO-RTE-PM | 12-ORA-5-14.5/17.1 |
Award Date | 03/05/2019 |
Closeout Date | Not set |
Work Description | South County Improvement Project (Phase 2 - Oso/Alicia) CONST BRIDGES, RW, SW, HMA PVMT, JPCP, DRAINAGE, AND ELECT SYSTEMS. |
Location Description | ORANGE COUNTY IN MISSION VIEJO AND LAGUNA HILLS FROM 0.7 MILE SOUTH OF OSO PARKWAY OVERCROSSING TO 0.3 MILE SOUTH OF ALICIA PARKWAY OVERCROSSING |
QA Service Level | 1 (Verified on 04/15/2019) |
Sample Information
Sample Taken Date | 01/18/2021 | Sample Unique Key | 4 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/19/2021 |
Sample type | Quality Control | A brief description of the sample | Mix Design 312 |
The quantity of what the sample constitutes | 20 cy | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Francisco | Last name of sampler or witnessed by | Lopez |
Title of sampler | Q C Supervisor | Telephone number of sampler | |
Laboratory sample identification | 008 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Coreslab Structures L A Inc | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name | Oso Parkway Route 5 |
Material Information
Material Type | Concrete | The concrete mix design number | 312 |
---|---|---|---|
The truck number from where the sample was collected | Truck 2 Batch 4 5 6 | The batch plant ticket number from where the sample was collected | 77246 77247 77248 |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Bed 9 from front discharge RMT into wheelbarrow | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2021-01-18-4
DIME Test ID: 2021-01-18-4-5
Testing Lab: Coreslab
Test Method: CTM 556-January 2018: Method of Test for Slump of Fresh Portland Cement Concrete
Test Release Date: 2021-01-20
Test Results
Input Type: Calculated
Tester's full name: Francisco Lopez
Date of test: 01/18/2021
Slump: 24.5 inch
General comments (publicly viewable) (Max 1000 characters): VSI 1
Test was verified on 1/20/2021 ✔