Test 2020-12-24-4-8 (ASTM C191-13) Summary

Project Information
Project IdentifiersProject ID: 8801
DEA: AML-CEM
EFIS: AML-CEM
DIST-CO-RTE-PM59---
Work DescriptionSpecial project for Cementitious Materials for use in Concrete Authorized Material List (AML)
Location DescriptionNot set
Sample Information
Sample Taken Date12/24/2020 Sample Unique Key4
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/24/2020
Sample typeAnnual Source Testing A brief description of the sampleBlended cement
The quantity of what the sample constitutes1 Bucket From where was the sample collectedSource
First name of sampler or witnessed byUnknown Last name of sampler or witnessed byUnknown
Title of sampler Laboratory sample identificationCM215112
The fabricator/manufacturer/facility nameSRMG Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name
Material Information
Material TypeCementitious BrandSalt River Materials Group
MillClarkdale Type of Cementitious MaterialBlended Cement
Test Details
DIME Sample ID: 2020-12-24-4
DIME Test ID: 2020-12-24-4-8
Testing Lab: CT HQ - Sacramento Cement Testing Laboratory
Test Method: ASTM C191-13: Standard Test Methods for Time of Setting of Hydraulic Cement by Vicat Needle
Test Release Date: 2021-05-28
Test Results

Input Type: Calculated
Tester's full name: Anthony Valdez
Date of test: 05/05/2021
Type of Water Used: Type IV grade reagent water
Initial time of setting:113 min
Final time of setting:no data
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 05/28/2021