Summary for Test 2020-10-07-2-3
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 212112 DEA: 080C2514 EFIS: 0816000076 COOP: 081645 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-10-0.0/13.2 |
| Award Date | 06/06/2018 |
| Closeout Date | Not set |
| Work Description | Design-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes |
| Location Description | LA/SBD County Line to PM 13.2 near I-15 |
| QA Service Level | 1 (Verified on 10/16/2019) |
Sample Information
| Sample Taken Date | 10/07/2020 | Sample Unique Key | 2 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/09/2020 |
| Sample type | Quality Assurance | A brief description of the sample | #6 butt splice welded hoops |
| The quantity of what the sample constitutes | 4 | From where was the sample collected | Fabricator |
| First name of sampler or witnessed by | Frederic | Last name of sampler or witnessed by | Aboujaoude |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | CMC Etiwanda | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | L147-055-20 | Structure unique identifier | |
| Structure name | Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Welded Hoops | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Ultimate | Rebar Heat Number(s) | 4100577 |
| Hoop Manufacturer Lot Number(s) | 7 | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Size | #6 |
| Diameter of Hoop | 3'-8" | Epoxy Coated | No |
| Epoxy Coating Color | NA | Rebar Manufacturer | CMC |
| Welding Company | CMC Etiwanda | Coating Standards | Uncoated |
| Weld Type | Flash Welded |
Test Details
DIME Sample ID: 2020-10-07-2
DIME Test ID: 2020-10-07-2-3
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Test Release Date: 2020-10-14
Test Results
Number of Samples: 1
Input Type: Measured
Tester's full name: fsaylor
Date of test: 10/14/2020
UTM: 400kip
Temperature: 72 f
| Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|
| 1 | 3 | 7 | 6/19mm | 0.44 | 44486.61 | 101106 | OK Necking | fsaylor |
General comments (publicly viewable) (Max 1000 characters): OK Necking
Test Graph
Source: Bluehill Data Point FileTest graph for the Sample
Test was verified on 10/14/2020 ✔
