Summary for Test 2020-06-02-34-5
Test performed: CTM 301-March 2000Project Information
| Project Identifiers | Project ID: 214589 DEA: 020J1604 |
|---|---|
| DIST-CO-RTE-PM | 02-PLU-284-0.0/8.3 |
| Award Date | 02/11/2020 |
| Closeout Date | 10/06/2020 |
| Work Description | PLACE HMA (TYPE A), PRECOATED AGGREGATE (SEAL COAT), HMA (LEVELING). |
| Location Description | PLUMAS COUNTY NEAR CHILCOOT FROM ROUTE 70 TO 1 MILE NORTH OF LITTLE LAST CHANCE CREEK BRIDGE NUMBER 09-0072 |
| QA Service Level | 1 (Verified on 01/22/2020) |
Sample Information
| Sample Taken Date | 06/02/2020 | Sample Unique Key | 34 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 06/11/2020 | Sample type | Department Acceptance |
| A brief description of the sample | 3/4" Shoulder Backing | The quantity of what the sample constitutes | 9000 tons |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | A |
| Last name of sampler or witnessed by | Sloaterman | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | D78469 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Joy Engineering | |
| Transportation Laboratory (TL) Number | 896985 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-32-0032 SPARROCK BAR ONE QUARRY |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | Stockpile @ Plant | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2020-06-02-34
DIME Test ID: 2020-06-02-34-5
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: CTM 301-March 2000: Method for Determining the Resistance "R" Value of Treated and Untreated Bases, Subbases, and Basement Soils by the Stabilometer
Test Release Date: 2020-09-16
Test Results
How will the R value be determined?: By stabilometer
Input Type: Calculated
Tester's full name: Terry McCormick
Date of test: 06/18/2020
As Received Gradation, Percent Passing 3 in. sieve: 100 %
As Received Gradation, Percent Passing 2 1/2 in. sieve: 100 %
As Received Gradation, Percent Passing 2 in. sieve: 100 %
As Received Gradation, Percent Passing 1 1/2 in. sieve: 100 %
As Received Gradation, Percent Passing 1 in. sieve: 100 %
As Received Gradation, Percent Passing 3/4 in. sieve: 99 %
As Received Gradation, Percent Passing 1/2 in. sieve: 87 %
As Received Gradation, Percent Passing 3/8 in. sieve: 78 %
As Received Gradation, Percent Passing #4 sieve: 58 %
As Received Gradation, Percent Passing #8 sieve: 43 %
As Received Gradation, Percent Passing #16 sieve: 32 %
As Received Gradation, Percent Passing #30 sieve: 25 %
As Received Gradation, Percent Passing #50 sieve: 19 %
As Received Gradation, Percent Passing #100 sieve: 15 %
As Received Gradation, Percent Passing #200 sieve: 11 %
As Used Gradation, Percent Passing 3 in. sieve: 100 %
As Used Gradation, Percent Passing 2 1/2 in. sieve: 100 %
As Used Gradation, Percent Passing 2 in. sieve: 100 %
As Used Gradation, Percent Passing 1 1/2 in. sieve: 100 %
As Used Gradation, Percent Passing 1 in. sieve: 100 %
As Used Gradation, Percent Passing 3/4 in. sieve: 100 %
As Used Gradation, Percent Passing 1/2 in. sieve: 88 %
As Used Gradation, Percent Passing 3/8 in. sieve: 78 %
As Used Gradation, Percent Passing #4 sieve: 58 %
As Used Gradation, Percent Passing #8 sieve: 43 %
As Used Gradation, Percent Passing #16 sieve: 32 %
As Used Gradation, Percent Passing #30 sieve: 25 %
As Used Gradation, Percent Passing #50 sieve: 19 %
As Used Gradation, Percent Passing #100 sieve: 15 %
As Used Gradation, Percent Passing #200 sieve: 12 %
R value: 77
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/16/2020 ✔