Summary for Test 2020-07-17-26-9
Test performed: ASTM C191-13Project Information
Project Identifiers | Project ID: 8801 DEA: AML-CEM EFIS: AML-CEM |
---|---|
DIST-CO-RTE-PM | 59--- |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Special project for Cementitious Materials for use in Concrete Authorized Material List (AML) |
Location Description | Not set |
QA Service Level | NOT VERIFIED |
Sample Information
Sample Taken Date | 07/17/2020 | Sample Unique Key | 26 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/17/2020 |
Sample type | Proficiency | A brief description of the sample | CCRL 217 |
The quantity of what the sample constitutes | 1 Bucket | From where was the sample collected | Source |
First name of sampler or witnessed by | Unknown | Last name of sampler or witnessed by | Unknown |
Title of sampler | CCRL 217 | Telephone number of sampler | |
Laboratory sample identification | CM208217 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | CCRL | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Cementitious | Brand | CCRL |
---|---|---|---|
Mill | CCRL | Type of Cementitious Material | Type II Cement |
Test Details
DIME Sample ID: 2020-07-17-26
DIME Test ID: 2020-07-17-26-9
Testing Lab: CT HQ - Sacramento Cement Testing Laboratory
Test Method: ASTM C191-13: Standard Test Methods for Time of Setting of Hydraulic Cement by Vicat Needle
Test Release Date: 2021-08-19
Test Results
Input Type: Calculated
Tester's full name: Spencer Adams
Date of test: 09/01/2020
Type of Water Used: Potable
Initial time of setting: 186 min
Final time of setting: 285 min
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/19/2021 ✔