Summary for Test 2015-01-06-11-4
Test performed: CTM 213-December 2012Project Information
| Project Identifiers | Project ID: 7613 DEA: 071218W4 EFIS: 0700021119 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-5-29.4/31.6 |
| Award Date | 11/29/2012 |
| Closeout Date | 07/31/2023 |
| Work Description | REALIGN ROUTE 5 AND RAILROAD TRACKS AND RECONFIGURE ON- AND OFF-RAMPS. |
| Location Description | LOS ANGELES COUNTY IN BURBANK FROM WEST MAGNOLIA BOULEVARD OVERCROSSING TO 0.3 MILE NORTH OF BUENA VISTA STREET/WINONA AVENUE UNDERCROSSING |
| QA Service Level | 1 (Verified on 10/08/2012) |
Sample Information
| Sample Taken Date | 01/06/2015 | Sample Unique Key | 11 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/06/2015 |
| Sample type | Annual Source Testing | A brief description of the sample | Washed Concrete Sand |
| The quantity of what the sample constitutes | 4 Bags | From where was the sample collected | Source |
| First name of sampler or witnessed by | Jeff | Last name of sampler or witnessed by | Pollard |
| Title of sampler | Supervisor of Technical Services | Telephone number of sampler | Unknown |
| Laboratory sample identification | 5006B | Linked DIME Sample ID | Unknown |
| The fabricator/manufacturer/facility name | Vulcan Sun Valley Sheldon | Transportation Laboratory (TL) Number | C 15 11 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | Not set | |
| Structure name | Not set | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | SMARA 91 19 0017 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | Unknown | The fabricator/manufacturer designation for the sample | Unknown |
| The plant number | Unknown | A detailed description of where the material sample was collected | Stockpiles |
| Where the material sample would have been placed if not sampled | Unknown | Primary Aggregate Nominal Size | fine |
| The concrete mix design number | Lot number | Not set | |
| Sublot number | Not set | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2015-01-06-11
DIME Test ID: 2015-01-06-11-4
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 213-December 2012: Method of Test for Organic Impurities in Concrete Sand
Test Release Date: 2015-02-23
Test Results
Input Type: Calculated
Tester's full name: Satish Jain
Date of test: 01/09/2015
Is the sample satisfactory or not?: Yes
Does debris exist: No
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 2/23/2015 ✔
