Summary for Test 2020-07-14-31-1
Test performed: AASHTO T240-17Project Information
| Project Identifiers | Project ID: 214726 DEA: 024H3304 EFIS: 0218000108 |
|---|---|
| DIST-CO-RTE-PM | 02-TRI-3-31.8/32.1 |
| Award Date | 04/22/2020 |
| Closeout Date | 10/21/2020 |
| Work Description | PLACE HMA (TYPE A) FOR TURN LANE & CORRUGATED STEEL PIPE FOR DRAINAGE. |
| Location Description | TRINITY COUNTY NEAR WEAVERVILLE FROM FIVE CENT GULCH STREET TO 0.5 MILE SOUTH OF EAST WEAVER CREEK ROAD |
| QA Service Level | 1 (Verified on 03/02/2020) |
Sample Information
| Sample Taken Date | 07/14/2020 | Sample Unique Key | 31 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 07/21/2020 | Sample type | Department Acceptance |
| A brief description of the sample | TEST Asphalt Binder | The quantity of what the sample constitutes | 1 Can, #1 Test (002562) |
| From where was the sample collected | Source | First name of sampler or witnessed by | D |
| Last name of sampler or witnessed by | Lockett | Title of sampler | Consultant |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Valero Benicia | |
| Transportation Laboratory (TL) Number | 002562 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 58-34 M |
|---|---|---|---|
| Modified | Yes | Lot number | 2 |
| Sublot number | 1 | Tank number | Not set |
| Time of sample | Not set | HMA Supplier | Not set |
| Certified Asphalt Supplier | Not set | Multigrade | Not set |
| Multigrade Type | Not set | Asphalt Binder Mix Number | Not set |
| HMA Type | Not set | HMA Supplier Mix ID Number | Not set |
Test Details
DIME Sample ID: 2020-07-14-31
DIME Test ID: 2020-07-14-31-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2020-09-23
Test Results
Is mass change based on one or two containers?: One
Input Type: Measured
Tester's full name: Ruben Macias
Date of test: 07/29/2020
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 171.150 grams
Mass of container #1 before test (m1i): 205.790 grams
Mass of container #1 after test (m1f): 205.600 grams
Average mass change: -0.548 percent
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/23/2020 ✔