Summary for Test 2019-12-26-3-4

Test performed: SMTL BILST-06

Project Information

Project IdentifiersProject ID: 213749
DEA: 120C1104
EFIS: 1200000633
DIST-CO-RTE-PM12-ORA-57-20.3/21.6
Award Date04/19/2019
Closeout Date05/28/2024
Work DescriptionSR-57 Lambert Interchange Project: WIDEN BRIDGES AND CONSTRUCT RW, SW, HMA, JPCP AND ELECTRICAL SYSTEMS.
Location DescriptionORANGE COUNTY IN BREA FROM 0.6 MILE SOUTH TO 0.7 MILE NORTH OF LAMBERT ROAD UNDERCROSSING
QA Service Level1 (Verified on 05/31/2019)

Sample Information

Sample Taken Date12/26/2019 Sample Unique Key3
Date that the sample was received by the laboratory/organization performing the testing01/06/2020 Sample typeQuality Assurance
A brief description of the sampleelastomeric bearing pad The quantity of what the sample constitutes11
From where was the sample collectedManufacturer First name of sampler or witnessed byHoward
Last name of sampler or witnessed bySternberg Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameScougal Rubber
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM1 - Elastomeric Bearing Pad Mfg. Lot Number(s)18009-2
Material/Compound/Elastomer IDna Samples Representing11
Description (size)3x20x20 CommentsUnknown
Description (Number of Shims)6 Type of Bearing PadSteel
Description (Thickness of Shims)14 gage Manufacturer(s)Scougal Rubber
Batch Numberna

Test Details

DIME Sample ID: 2019-12-26-3
DIME Test ID: 2019-12-26-3-4
Testing Lab: CT HQ - Sacramento Chemistry Laboratory
Test Method: SMTL BILST-06: (Neoprene Verification) Bilstein Test
Test Release Date: 2020-01-08

Test Results


Input Type: Calculated
Tester's full name: Mariano Pontillas
Date of test: 01/08/2020
Result: Pass
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 1/8/2020 ✔