Project Details

This page displays current information for project DEA: 120C1104.

Project Information

Project IdentifiersProject ID: 213749
DEA: 120C1104
EFIS: 1200000633
DIST-CO-RTE-PM12-ORA-57-20.3/21.6
Award Date04/19/2019
Closeout DateNot set
Work DescriptionSR-57 Lambert Interchange Project: WIDEN BRIDGES AND CONSTRUCT RW, SW, HMA, JPCP AND ELECTRICAL SYSTEMS.
Location DescriptionORANGE COUNTY IN BREA FROM 0.6 MILE SOUTH TO 0.7 MILE NORTH OF LAMBERT ROAD UNDERCROSSING
QA Service Level1 (Verified on 05/31/2019)

Samples

Samples submitted for this project.
Displaying 1-10 of 31 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
2022-10-29-110/29/2022Quality AssuranceHot Mix AsphaltView
2022-10-19-1310/19/202210/19/2022Quality AssuranceConcreteView
2022-10-04-6210/04/202210/05/2022Quality AssuranceConcreteView
2022-01-28-2501/28/202202/14/2022Quality AssuranceSMTL TM5 - CouplersView
2021-08-18-1908/18/202108/20/2021Quality AssuranceSMTL TM6 - Ductile Iron Cast SamplesView
2021-06-14-106/14/202106/15/2021Quality AssuranceSMTL TM5 - Welded HoopsView
2021-06-14-206/14/202106/15/2021Quality ControlSMTL TM5 - Welded HoopsView
2021-05-27-3605/27/202106/17/2021Quality AssuranceSMTL TM5 - CouplersView
2021-05-27-3705/27/202106/17/2021Quality AssuranceSMTL TM5 - CouplersView
2021-05-19-1005/19/202105/21/2021Quality AssuranceSMTL TM6 - Ductile Iron Cast SamplesView

Job Mix Formula (JMF)

JMFs associated with this project.
JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs submitted for this project.
Declaration NumberProgram OperatorMaterial TypeVendorSubmitted by
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods