Summary for Test 2019-11-15-13-2
Test performed: AASHTO T308-10
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.
Project Information
| Project Identifiers | DEA: No Project |
|---|---|
| DIST-CO-RTE-PM | --- |
| Award Date | Not set |
| Closeout Date | 11/01/2022 |
| Work Description | Special project identifier for material not associated with a project |
| Location Description | Not set |
| QA Service Level | NOT VERIFIED |
Sample Information
| Sample Taken Date | 11/15/2019 | Sample Unique Key | 13 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 11/15/2019 |
| Sample type | Quality Control | A brief description of the sample | Combined Rap |
| The quantity of what the sample constitutes | JMF Submittal | From where was the sample collected | Source |
| First name of sampler or witnessed by | Sampler First Name | Last name of sampler or witnessed by | Sampler Last Name |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Vulcan Pleasanton | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Vulcan materials |
|---|---|---|---|
| Aggregate Size | 1/2-inch | Aggregate Source | |
| RAP Stockpile | Stockpile Size (tons) | ||
| Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2019-11-15-13
DIME Test ID: 2019-11-15-13-2
Testing Lab: CT HQ - Sacramento Hot Mix Asphalt Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2019-11-16
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Clinton Edmiston
Date of test: 11/15/2019
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): no data
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 5.38 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 11/16/2019 ✔
Warning: The test results shown on this page have been superseded and are invalid.
This information is for reference only.
