Summary for Test 2019-09-10-15-6

Test performed: CTM 217-June 2011

Project Information

Project IdentifiersProject ID: 7613
DEA: 071218W4
EFIS: 0700021119
DIST-CO-RTE-PM07-LA-5-29.4/31.6
Award Date11/29/2012
Closeout Date07/31/2023
Work DescriptionREALIGN ROUTE 5 AND RAILROAD TRACKS AND RECONFIGURE ON- AND OFF-RAMPS.
Location DescriptionLOS ANGELES COUNTY IN BURBANK FROM WEST MAGNOLIA BOULEVARD OVERCROSSING TO 0.3 MILE NORTH OF BUENA VISTA STREET/WINONA AVENUE UNDERCROSSING
QA Service Level1 (Verified on 10/08/2012)

Sample Information

Sample Taken Date09/10/2019 Sample Unique Key15
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/13/2019
Sample typeVerification A brief description of the sample3/4 HMA-A R10
The quantity of what the sample constitutesPSE 12 bags From where was the sample collectedManufacturer
First name of sampler or witnessed byVulcan Sun Valley Last name of sampler or witnessed byQC
Title of sampler Telephone number of sampler
Laboratory sample identification0528A-19 Linked DIME Sample ID
The fabricator/manufacturer/facility nameVulcan Sun Valley Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-19-0021::BIG ROCK CREEK- VULCAN
The fabricator's/manufacturer's product name for the sample3/4 HMA-A R10 The fabricator/manufacturer designation for the sample220805 SVA VLO
The plant numberUnknown A detailed description of where the material sample was collectedBelt Cut at Vulcan Sun Valley Plant
Where the material sample would have been placed if not sampledUnknown Primary Aggregate Nominal Size3/4 inch
The concrete mix design numberUnknown Lot numberUnknown
Sublot numberUnknown Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2019-09-10-15
DIME Test ID: 2019-09-10-15-6
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2019-10-07

Test Results


Number of tests: 3
Input Type: Calculated
Tester's full name: Edmond Jabbour
Date of test: 09/19/2019
Temperature correction: 0
Temperature of solution: 73
Clay reading (test 1): 5.6
Sand reading (test 1): 4.5
Clay reading (test 2): 5.7
Sand reading (test 2): 4.4
Clay reading (test 3): 5.6
Sand reading (test 3): 4.2
Sand equivalent (test 1): 81
Sand equivalent (test 2): 78
Sand equivalent (test 3): 75
Sand equivalent before temperature correction: 78
Sand equivalent after temperature correction: 78
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 10/7/2019