Summary for Test 2019-06-11-3-3
Test performed: CTM 204-June 2010Project Information
| Project Identifiers | DEA: No Project |
|---|---|
| DIST-CO-RTE-PM | --- |
| Award Date | Not set |
| Closeout Date | 11/01/2022 |
| Work Description | Special project identifier for material not associated with a project |
| Location Description | Not set |
| QA Service Level | NOT VERIFIED |
Sample Information
| Sample Taken Date | 06/11/2019 | Sample Unique Key | 3 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/11/2019 |
| Sample type | Quality Control | A brief description of the sample | agg |
| The quantity of what the sample constitutes | JMF Verification | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | gh | Last name of sampler or witnessed by | bob |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | blahg | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-45-0017::FAWNDALE ROCK QUARRY |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | Unknown | The fabricator/manufacturer designation for the sample | Unknown |
| The plant number | Unknown | A detailed description of where the material sample was collected | stockpile |
| Where the material sample would have been placed if not sampled | Unknown | Primary Aggregate Nominal Size | fine |
| The concrete mix design number | Unknown | Lot number | Unknown |
| Sublot number | Unknown | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2019-06-11-3
DIME Test ID: 2019-06-11-3-3
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: CTM 204-June 2010: Method of Test for Liquid Limit, Plastic Limit and Plasticity Index of Soils (Plasticity Index)
Test Release Date: 2019-06-11
Test Results
The test method used?: Plastic Index
Input Type: Calculated
Tester's full name: Ward Jenkins
Date of test: 06/11/2019
Liquid Limit (LL): 0 %
Plastic Limit (PL): 0 %
Plastic Index(PI): NP
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/11/2019 ✔
