Summary for Test 2019-04-01-34-2
Test performed: AASHTO T30-15Project Information
| Project Identifiers | DEA: No Project |
|---|---|
| DIST-CO-RTE-PM | --- |
| Award Date | Not set |
| Closeout Date | 11/01/2022 |
| Work Description | Special project identifier for material not associated with a project |
| Location Description | Not set |
| QA Service Level | NOT VERIFIED |
Sample Information
| Sample Taken Date | 04/01/2019 | Sample Unique Key | 34 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 04/01/2019 | Sample type | Quality Control |
| A brief description of the sample | -3/8 inch RAP | The quantity of what the sample constitutes | Mix Design |
| From where was the sample collected | Source | First name of sampler or witnessed by | CGI |
| Last name of sampler or witnessed by | CGI | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Shaw Pit Facility | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Shaw Pit Facility |
|---|---|---|---|
| Aggregate Size | 3/8-inch | Aggregate Source | Unknown |
| RAP Stockpile | Stockpile Size (tons) | Unknown | |
| Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2019-04-01-34
DIME Test ID: 2019-04-01-34-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2019-05-08
Test Results
Input Type: Calculated
Tester's full name: CGI
Date of test: 04/01/2019
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 99 %
Cumulative percent passing the 1/4 in. sieve: 84 %
Cumulative percent passing the #4 sieve: 69 %
Cumulative percent passing the #8 sieve: 47 %
Cumulative percent passing the #16 sieve: 32 %
Cumulative percent passing the #30 sieve: 21 %
Cumulative percent passing the #50 sieve: 16 %
Cumulative percent passing the #100 sieve: 13 %
Cumulative percent passing the #200 sieve: 9.1 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 5/8/2019 ✔
