Summary for Test 2018-02-27-26-1
Test performed: CTM 202-Oct 2014Project Information
| Project Identifiers | DEA: No Project |
|---|---|
| DIST-CO-RTE-PM | --- |
| Award Date | Not set |
| Closeout Date | 11/01/2022 |
| Work Description | Special project identifier for material not associated with a project |
| Location Description | Not set |
| QA Service Level | NOT VERIFIED |
Sample Information
| Sample Taken Date | 02/27/2018 | Sample Unique Key | 26 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 02/27/2018 | Sample type | Quality Control |
| A brief description of the sample | 1/2 HMA | The quantity of what the sample constitutes | JMF Renewal |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Tom |
| Last name of sampler or witnessed by | Cromwell | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | 18-J-006 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | SPM-Templeton | |
| Transportation Laboratory (TL) Number | 18-J-006 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Not set | Structure name | Not set |
| Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Stockpile |
|---|---|---|---|
| Aggregate Size | 1/2 | Aggregate Source | Unknown |
| RAP Stockpile | Stockpile Size (tons) | Unknown | |
| Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2018-02-27-26
DIME Test ID: 2018-02-27-26-1
Testing Lab: Sierra Pacific Materials
Test Method: CTM 202-Oct 2014: Method of Test for Determining Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2019-02-24
Test Results
What size aggregate is being tested?: Combined Gradation
Input Type: Calculated
Tester's full name: unknown
Date of test: 03/22/2018
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 99.1 %
Cumulative percent passing the 3/8 in. sieve: 92.8 %
Cumulative percent passing the #4 sieve: 75.9 %
Cumulative percent passing the #8 sieve: 62.3 %
Cumulative percent passing the #16 sieve: 49.6 %
Cumulative percent passing the #30 sieve: 36.2 %
Cumulative percent passing the #50 sieve: 23.4 %
Cumulative percent passing the #100 sieve: 14.1 %
Cumulative percent passing the #200 sieve: 9.5 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 2/24/2019 ✔