Summary for Test 2026-04-28-79-3
Test performed: CTM 504-June 2010Project Information
| Project Identifiers | Project ID: 994654 DEA: 07313504 EFIS: 0715000090 |
|---|---|
| DIST-CO-RTE-PM | 07-LA,VEN-1-37.7/62.9,0.0/0.9 |
| Award Date | 07/20/2023 |
| Closeout Date | Not set |
| Work Description | REMOVE AND CONSTRUCT BRIDGE AND CULVERTS. |
| Location Description | LOS ANGELES AND VENTURA COUNTIES AT VARIOUS LOCATIONS FROM 0.4 MILE SOUTH OF TEMESCAL CANYON ROAD TO 0.1 MILE NORTH OF TONGA STREET |
| QA Service Level | 1 (Verified on 07/24/2023) |
Sample Information
| Sample Taken Date | 04/28/2026 | Sample Unique Key | 79 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 04/29/2026 | Sample type | Quality Control |
| A brief description of the sample | 6x12 Cylinders | The quantity of what the sample constitutes | 6 |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Erik |
| Last name of sampler or witnessed by | Villalba | Title of sampler | Field Technician |
| Telephone number of sampler | Laboratory sample identification | ORSLBD50 Set 2 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Associated Ready Mix | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | Bridge Paving | |
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | ORSLBD50 |
|---|---|---|---|
| The truck number from where the sample was collected | 452 | The batch plant ticket number from where the sample was collected | 6144117 |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | Set 2 | |
| A detailed description of where the material sample was collected | E/B PCH | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2026-04-28-79
DIME Test ID: 2026-04-28-79-3
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2026-09-23
Test Results
Input Type: Calculated
Tester's full name: Erik Villalba
Date of test: 04/28/2026
Air Content: 1.2 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/23/2026 ✔
