Project Details
This page displays current information for project DEA: 07313504.
Project Information
Project Identifiers | Project ID: 994654 DEA: 07313504 EFIS: 0715000090 |
---|---|
DIST-CO-RTE-PM | 07-LA,VEN-1-37.7/62.9,0.0/0.9 |
Award Date | 07/20/2023 |
Closeout Date | Not set |
Work Description | REMOVE AND CONSTRUCT BRIDGE AND CULVERTS. |
Location Description | LOS ANGELES AND VENTURA COUNTIES AT VARIOUS LOCATIONS FROM 0.4 MILE SOUTH OF TEMESCAL CANYON ROAD TO 0.1 MILE NORTH OF TONGA STREET |
QA Service Level | 1 (Verified on 07/24/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
dan.leon@dot.ca.gov | Dan Leon | Resident Engineer | Caltrans RE DB |
aziz.maghsoudloo@bureauveritas.com | Aziz Maghsoudloo | Structural Representative | Caltrans SR DB |
raymond.aludino@dot.ca.gov | Raymond Aludino | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 18 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-01-24-1 | 01/24/2024 | 01/26/2024 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2024-01-24-2 | 01/24/2024 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2024-01-22-1 | 01/22/2024 | 01/25/2024 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2024-01-22-2 | 01/22/2024 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2024-01-16-1 | 01/16/2024 | 01/17/2024 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2024-01-16-2 | 01/16/2024 | 01/16/2024 | Quality Control | SMTL TM5 - Welded Hoops | View |
2024-01-09-3 | 01/09/2024 | 01/10/2024 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2024-01-09-4 | 01/09/2024 | 01/09/2024 | Quality Control | SMTL TM5 - Welded Hoops | View |
2024-01-04-1 | 01/04/2024 | 01/05/2024 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2024-01-03-1 | 01/03/2024 | 01/05/2024 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods