Summary for Test 2026-08-17-81-1
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 993331 DEA: 023H6904 EFIS: 0218000010 |
|---|---|
| DIST-CO-RTE-PM | 02-PLU-89-30/R42.1 |
| Award Date | 11/21/2024 |
| Closeout Date | Not set |
| Work Description | ALMANOR WEST REHAB - ROADWAY REHABILITATION |
| Location Description | IN PLUMAS COUNTY NEAR CANYON DAM FROM LAKE ALMANOR SPILLWAY TO ROUTE 36. |
| QA Service Level | 1 (Verified on 10/14/2021) |
Sample Information
| Sample Taken Date | 08/17/2026 | Sample Unique Key | 81 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 08/17/2026 | Sample type | Acceptance |
| A brief description of the sample | 3 Boxes of Lime Treated 1/2-inch Type A HMA (eq. PG 64-28) | The quantity of what the sample constitutes | Not Provided |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Jerry |
| Last name of sampler or witnessed by | Pannell | Title of sampler | Consultant |
| Telephone number of sampler | Laboratory sample identification | D80345 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Dig It Construction – Sierra Cascade Aggregate and Asphalt Products (Chester, CA) | |
| Transportation Laboratory (TL) Number | 846477 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 1/2 inch | Lot number | |
| Sublot number | HMA Mix Number | ||
| Binder content (%) | 5.8 | Virgin binder PG | PG 64-28 |
| Design binder PG | Binder Supplier | Albina (Klamath Falls, OR) | |
| RAP content (%) | 21 | WMA Additives | No |
| Antistrip type | 1.0% Lime |
Test Details
DIME Sample ID: 2026-08-17-81
DIME Test ID: 2026-08-17-81-1
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2026-09-14
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Dacota Mei
Date of test: 09/02/2026
Test procedure used?: Method A
Mass of the specimen basket assembly: 3020.1 g
Mass of the specimen and specimen basket assembly prior to ignition: 4572.5 g
Mass of HMA Sample prior to ignition: 1552.4 g
Mass Loss: 93.6 g
Mass of aggregate remaining after ignition: 1458.8 g
Correction Factor (Percent by mass of HMA Specimen): 0.47 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.19 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 5.37 %
General comments (publicly viewable) (Max 1000 characters): Pb=5.36%, Target=5.5-6.3%
Test was verified on 9/14/2026 ✔
