Project Details
This page displays current information for project DEA: 023H6904.
Project Information
Project Identifiers | Project ID: 993331 DEA: 023H6904 EFIS: 0218000010 |
---|---|
DIST-CO-RTE-PM | 02-PLU-89-30/R42.1 |
Award Date | 11/21/2024 |
Closeout Date | Not set |
Work Description | ALMANOR WEST REHAB - ROADWAY REHABILITATION |
Location Description | IN PLUMAS COUNTY NEAR CANYON DAM FROM LAKE ALMANOR SPILLWAY TO ROUTE 36. |
QA Service Level | 1 (Verified on 10/14/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
peter.gan@dot.ca.gov | Peter Gan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-5 of 5 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-10-07-108 | 10/07/2021 | 10/07/2021 | Preliminary | Soil | View |
2021-10-07-83 | 10/07/2021 | 10/07/2021 | Preliminary | Soil | View |
2021-10-07-82 | 10/07/2021 | 10/07/2021 | Preliminary | Soil | View |
2021-10-07-81 | 10/07/2021 | 10/07/2021 | Preliminary | Soil | View |
2021-10-07-80 | 10/07/2021 | 10/07/2021 | Preliminary | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods