Summary for Test 2026-07-29-29-1
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 993118 DEA: 101C3304 EFIS: 1014000146 |
|---|---|
| DIST-CO-RTE-PM | 10-SJ-205-R4.6/R9.0 |
| Award Date | 04/05/2022 |
| Closeout Date | Not set |
| Work Description | Widening bridges, ramps and roadway. SR205 SMART CORRIDOR - PHASE 2 |
| Location Description | On state highway in San Joaquin County in and near Tracy from Janney Overhead to 1.3 miles east of MacArthur Drive Overcrossing. |
| QA Service Level | 1 (Verified on 07/06/2022) |
Sample Information
| Sample Taken Date | 07/29/2026 | Sample Unique Key | 29 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 07/31/2026 |
| Sample type | Quality Assurance | A brief description of the sample | #11 Coupler |
| The quantity of what the sample constitutes | 4 | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Johnsky | Last name of sampler or witnessed by | Oveny |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | C&N Reinforcment | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Ultimate | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Manufacturer | CMC |
| Coupler Manufacturer | HRC | Intermediate Assembler or Fabricator | |
| Rebar Size | #11 | Coupler Model | HRC 500/510 |
| Coating Standards | Uncoated | Shape of Rebar | Straight |
| Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
| Coupler Component Heat/Lot Number(s) | 73142156, 73142654 | Rebar Heat Number(s) | 9012799, 9012800 |
| Rebar Size 2 | Coupler Unique ID | TP-17-03 |
Test Details
DIME Sample ID: 2026-07-29-29
DIME Test ID: 2026-07-29-29-1
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)
Test Release Date: 2026-08-10
Test Results
Number of Samples: 4
Input Type: Measured
Tester's full name: Andrew Auvinen
Date of test: 08/10/2026
UTM: NA
Halo ID: NA
Temperature: 0 f
| Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Slip (inch) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|---|
| 1 | 1 | 1 | 11 | 1.56 | 0.0021 | 146670 | 94019 | NA | Atlas |
| 2 | 2 | 1 | 11 | 1.56 | 0 | 147500 | 94551 | NA | Atlas |
| 3 | 3 | 1 | 11 | 1.56 | 0 | 147830 | 94763 | NA | Atlas |
| 4 | 4 | 1 | 11 | 1.56 | 0 | 147070 | 94276 | NA | Atlas |
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/10/2026 ✔
