Summary for Test 2026-07-16-76-2
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 993331 DEA: 023H6904 EFIS: 0218000010 |
|---|---|
| DIST-CO-RTE-PM | 02-PLU-89-30/R42.1 |
| Award Date | 11/21/2024 |
| Closeout Date | Not set |
| Work Description | ALMANOR WEST REHAB - ROADWAY REHABILITATION |
| Location Description | IN PLUMAS COUNTY NEAR CANYON DAM FROM LAKE ALMANOR SPILLWAY TO ROUTE 36. |
| QA Service Level | 1 (Verified on 10/14/2021) |
Sample Information
| Sample Taken Date | 07/16/2026 | Sample Unique Key | 76 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 07/16/2026 | Sample type | Production Start-Up |
| A brief description of the sample | 1 bag RAP | The quantity of what the sample constitutes | Production Start Up Evaluation |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Brandon |
| Last name of sampler or witnessed by | White | Title of sampler | TET |
| Telephone number of sampler | Laboratory sample identification | D80296B | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Dig It Construction – Sierra Cascade Aggregate and Asphalt Products (Chester, CA) | |
| Transportation Laboratory (TL) Number | 896868 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Dig It Construction |
|---|---|---|---|
| Aggregate Size | Aggregate Source | ||
| RAP Stockpile | Stockpile Size (tons) | ||
| Reclaimed Asphalt Pavement Mix Number |
Test Details
DIME Sample ID: 2026-07-16-76
DIME Test ID: 2026-07-16-76-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2026-08-03
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Sean McWithey
Date of test: 07/23/2026
Test procedure used?: Method A
Mass of the specimen basket assembly: 3020.5 g
Mass of the specimen and specimen basket assembly prior to ignition: 5136.8 g
Mass of HMA Sample prior to ignition: 2116.3 g
Mass Loss: 124.3 g
Mass of aggregate remaining after ignition: 1992.0 g
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.14 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 5.73 %
General comments (publicly viewable) (Max 1000 characters): Pbr(uncorrected)=5.73%
Pbr≈5.00%
Test was verified on 8/3/2026 ✔
