Summary for Test 2026-07-15-67-2
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 993331 DEA: 023H6904 EFIS: 0218000010 |
|---|---|
| DIST-CO-RTE-PM | 02-PLU-89-30/R42.1 |
| Award Date | 11/21/2024 |
| Closeout Date | Not set |
| Work Description | ALMANOR WEST REHAB - ROADWAY REHABILITATION |
| Location Description | IN PLUMAS COUNTY NEAR CANYON DAM FROM LAKE ALMANOR SPILLWAY TO ROUTE 36. |
| QA Service Level | 1 (Verified on 10/14/2021) |
Sample Information
| Sample Taken Date | 07/15/2026 | Sample Unique Key | 67 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/13/2026 |
| Sample type | Acceptance | A brief description of the sample | 1 Bag RAP |
| The quantity of what the sample constitutes | 225 Tons | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Brandon | Last name of sampler or witnessed by | White |
| Title of sampler | TET | Telephone number of sampler | |
| Laboratory sample identification | D80290B | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Dig It Construction – Sierra Cascade Aggregate and Asphalt Products (Chester, CA) | Transportation Laboratory (TL) Number | 848650 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Dig It Construction |
|---|---|---|---|
| Aggregate Size | Aggregate Source | ||
| RAP Stockpile | Stockpile Size (tons) | ||
| Reclaimed Asphalt Pavement Mix Number |
Test Details
DIME Sample ID: 2026-07-15-67
DIME Test ID: 2026-07-15-67-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2026-07-28
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Sean McWithey
Date of test: 07/22/2026
Test procedure used?: Method A
Mass of the specimen basket assembly: 3159.8 g
Mass of the specimen and specimen basket assembly prior to ignition: 4680.1 g
Mass of HMA Sample prior to ignition: 1520.3 g
Mass Loss: 100.3 g
Mass of aggregate remaining after ignition: 1420.0 g
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.20 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 6.40 %
General comments (publicly viewable) (Max 1000 characters): Pbr(uncorrected)=6.40%, Pbr≈5.67%
Test was verified on 7/28/2026 ✔
