Summary for Test 2017-04-20-28-4
Test performed: AASHTO T269-14Project Information
| Project Identifiers | DEA: No Project |
|---|---|
| DIST-CO-RTE-PM | --- |
| Award Date | Not set |
| Closeout Date | 11/01/2022 |
| Work Description | Special project identifier for material not associated with a project |
| Location Description | Not set |
| QA Service Level | NOT VERIFIED |
Sample Information
| Sample Taken Date | 04/20/2017 | Sample Unique Key | 28 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/20/2017 |
| Sample type | Quality Control | A brief description of the sample | 1/2-inch Type A HMA, PG 64-16 |
| The quantity of what the sample constitutes | Mix Design | From where was the sample collected | Other |
| First name of sampler or witnessed by | PEI | Last name of sampler or witnessed by | PEI |
| Title of sampler | Unknown | Telephone number of sampler | Unknown |
| Laboratory sample identification | Unknown | Linked DIME Sample ID | Unknown |
| The fabricator/manufacturer/facility name | Pavement Engineering Inc | Transportation Laboratory (TL) Number | Unknown |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | Not set |
| Structure name | Not set | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 1/2 inch | Lot number | Not set |
| Sublot number | Not set | HMA Mix Number | Not set |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set | HMA Pay | No |
Test Details
DIME Sample ID: 2017-04-20-28
DIME Test ID: 2017-04-20-28-4
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T269-14: Standard Method of Test for Percent Air Voids in Compacted Dense and Open Asphalt Mixtures (Air Void)
Test Release Date: 2018-03-22
Test Results
Number of tests: 3
Is the sample lab compacted or field compacted?:
Input Type: Calculated
Tester's full name: PEI
Date of test: 04/20/2017
| 1 | 2 | 3 | |
|---|---|---|---|
4.0 % | 4.0 % | 4.0 % | |
4.0 % |
General comments (publicly viewable) (Max 1000 characters): Data input by Ward Jenkins for PEI during beta.
Test was verified on 3/22/2018 ✔
