Summary for Test 2025-10-30-68-2

Test performed: AASHTO T308-10

Project Information

Project IdentifiersProject ID: 994539
DEA: 021H58U4
EFIS: 0223000059
DIST-CO-RTE-PM02-PLU-70-58.2/R78.4
Award Date06/27/2023
Closeout DateNot set
Work DescriptionRECONSTRUCT ROADWAY, HMA PAVING, DRAINAGE AND ELECTRICAL WORK.
Location DescriptionPLUMAS COUNTY AT AND NEAR CROMBERG FROM GILL RANCH ROAD TO 0.2 MILE WEST OF BIG GRIZZLY CREEK BRIDGE
QA Service Level1 (Verified on 05/08/2023)

Sample Information

Sample Taken Date10/30/2025 Sample Unique Key68
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing11/10/2025
Sample typeAcceptance A brief description of the sample16 boxes of Lime Treated 3/4-inch HMA-A w/15% RAP, PG 64-28 M from Pacific Northwest - Stockton, Ca
The quantity of what the sample constitutes1300 From where was the sample collectedManufacturer
First name of sampler or witnessed byReilly Last name of sampler or witnessed byMelvin
Title of samplerConsultant Telephone number of sampler
Laboratory sample identificationD80120 Linked DIME Sample ID
The fabricator/manufacturer/facility nameWestern NV Materials, Spanish Springs Transportation Laboratory (TL) Number875190
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number
Sublot number HMA Mix Number
Binder content (%)4.7 Virgin binder PG PG 64-28M
Design binder PG PG 64-28M Binder SupplierPacific Northwest (Stockton, CA)
RAP content (%)15 WMA AdditivesNo
Antistrip type1.0% Lime

Test Details

DIME Sample ID: 2025-10-30-68
DIME Test ID: 2025-10-30-68-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2025-12-01

Test Results


What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Sean McWithey
Date of test: 11/19/2025
Test procedure used?: Method A
Mass of the specimen basket assembly: 3041.6 g
Mass of the specimen and specimen basket assembly prior to ignition: 5194.8 g
Mass of HMA Sample prior to ignition: 2153.2 g
Mass Loss: 113.2 g
Mass of aggregate remaining after ignition: 2040.0 g
Correction Factor (Percent by mass of HMA Specimen): 0.08 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.14 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 5.04 %
General comments (publicly viewable) (Max 1000 characters): Pb=5.04%, TV=4.70%

Test was verified on 12/1/2025