Project Details
This page displays current information for project DEA: 021H58U4.
Project Information
Project Identifiers | Project ID: 994539 DEA: 021H58U4 EFIS: 0223000059 |
---|---|
DIST-CO-RTE-PM | 02-PLU-70-58.2/R78.4 |
Award Date | 06/27/2023 |
Closeout Date | Not set |
Work Description | RECONSTRUCT ROADWAY, HMA PAVING, DRAINAGE AND ELECTRICAL WORK. |
Location Description | PLUMAS COUNTY AT AND NEAR CROMBERG FROM GILL RANCH ROAD TO 0.2 MILE WEST OF BIG GRIZZLY CREEK BRIDGE |
QA Service Level | 1 (Verified on 05/08/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
mike.zdenek@dot.ca.gov | Mike Zdenek | Resident Engineer | Caltrans RE DB |
Margaret.McNally@dot.ca.gov | Margaret McNally | Structural Representative | Caltrans SR DB |
peter.gan@dot.ca.gov | Peter Gan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 215 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2025-04-01-28 | 04/01/2025 | 04/01/2025 | Quality Control | Aggregate | View |
2025-04-01-27 | 04/01/2025 | 04/01/2025 | Quality Control | Aggregate | View |
2025-04-01-26 | 04/01/2025 | 04/01/2025 | Quality Control | Aggregate | View |
2025-03-27-40 | 03/27/2025 | 03/27/2025 | Quality Control | Aggregate | View |
2025-03-27-39 | 03/27/2025 | 03/27/2025 | Quality Control | Aggregate | View |
2025-03-27-38 | 03/27/2025 | 03/27/2025 | Quality Control | Aggregate | View |
2025-04-03-26 | 04/03/2025 | 04/03/2025 | Quality Control | Concrete | View |
2025-04-02-6 | 04/02/2025 | 04/02/2025 | Quality Control | Concrete | View |
2025-03-31-1 | 03/31/2025 | 03/31/2025 | Quality Control | Concrete | View |
2025-03-18-32 | 03/18/2025 | 03/18/2025 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods