Summary for Test 2025-09-17-34-1

Test performed: ASTM C136-06

Project Information

Project Identifiers
DEA: No Project
DIST-CO-RTE-PM---
Award DateNot set
Closeout Date11/01/2022
Work DescriptionSpecial project identifier for material not associated with a project
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Sample Information

Sample Taken Date09/17/2025 Sample Unique Key34
Date that the sample was received by the laboratory/organization performing the testing09/18/2025 Sample typeQuality Control
A brief description of the samplesand The quantity of what the sample constitutes40 of 1500
From where was the sample collectedJob Site First name of sampler or witnessed byjbeal
Last name of sampler or witnessed byjbeal Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility namewinsor
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)1234
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedshovel
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1-1/2 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2025-09-17-34
DIME Test ID: 2025-09-17-34-1
Testing Lab: Stonemont Solutions, Incorporated
Test Method: ASTM C136-06: Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2025-09-18

Test Results


What type of gradation is being tested?: Combined Gradation
Input Type: Calculated
Tester's full name: James Beal
Date of test: 09/18/2025
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 90 %
Cumulative percent passing the 1 in. sieve: 80 %
Cumulative percent passing the 3/4 in. sieve: 85 %
Cumulative percent passing the 1/2 in. sieve: 80 %
Cumulative percent passing the 3/8 in. sieve: 75 %
Cumulative percent passing the #4 sieve: 70 %
Cumulative percent passing the #8 sieve: 65 %
Cumulative percent passing the #16 sieve: 60 %
Cumulative percent passing the #30 sieve: 55 %
Cumulative percent passing the #50 sieve: 40 %
Cumulative percent passing the #100 sieve: 15 %
Cumulative percent passing the #200 sieve: 5 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 9/18/2025 ✔