Summary for Test 2025-08-11-44-2
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 993331 DEA: 023H6904 EFIS: 0218000010 |
|---|---|
| DIST-CO-RTE-PM | 02-PLU-89-30/R42.1 |
| Award Date | 11/21/2024 |
| Closeout Date | Not set |
| Work Description | ALMANOR WEST REHAB - ROADWAY REHABILITATION |
| Location Description | IN PLUMAS COUNTY NEAR CANYON DAM FROM LAKE ALMANOR SPILLWAY TO ROUTE 36. |
| QA Service Level | 1 (Verified on 10/14/2021) |
Sample Information
| Sample Taken Date | 08/11/2025 | Sample Unique Key | 44 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/11/2025 |
| Sample type | Production Start-Up | A brief description of the sample | 1 Bag RAP |
| The quantity of what the sample constitutes | Production Start Up Evaluation | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Brandon | Last name of sampler or witnessed by | White |
| Title of sampler | TET | Telephone number of sampler | |
| Laboratory sample identification | D79996B | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Dig It Construction – Sierra Cascade Aggregate and Asphalt Products (Chester, CA) | Transportation Laboratory (TL) Number | 858146 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Sierra Cascade Aggregate |
|---|---|---|---|
| Aggregate Size | Aggregate Source | ||
| RAP Stockpile | Stockpile Size (tons) | ||
| Reclaimed Asphalt Pavement Mix Number |
Test Details
DIME Sample ID: 2025-08-11-44
DIME Test ID: 2025-08-11-44-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2025-08-20
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Sean McWithey
Date of test: 08/14/2025
Test procedure used?: Method A
Mass of the specimen basket assembly: 3040.5 g
Mass of the specimen and specimen basket assembly prior to ignition: 4669.1 g
Mass of HMA Sample prior to ignition: 1628.6 g
Mass Loss: 114.4 g
Mass of aggregate remaining after ignition: 1514.2 g
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.18 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 6.84 %
General comments (publicly viewable) (Max 1000 characters): Pb(Uncorrected)=6.84%
Test was verified on 8/20/2025 ✔
