Summary for Test 2025-07-31-3-6

Test performed: CTM TEMP1-16

Project Information

Project IdentifiersProject ID: 1000004
DEA: 033H5604
EFIS: 0318000014
DIST-CO-RTE-PM03-PLA,NEV-20,80-VAR
Award Date05/10/2024
Closeout DateNot set
Work DescriptionSTRUCTURAL CONC, BAR REINFORCING STEEL, BRIDGE REMOVAL, HMA, AND JPCP.
Location DescriptionPLACER AND NEVADA COUNTIES NEAR CISCO GROVE ON ROUTE 80 FROM 0.4 MILE WEST OF LAKE VALLEY OVERCROSSING TO 0.9 MILE EAST OF YUBA PASS SEPARATION AND OVERHEAD AND ON ROUTE 20 AT YUBA PASS SEPARATION AND OVERHEAD
QA Service Level1 (Verified on 01/18/2024)

Sample Information

Sample Taken Date07/31/2025 Sample Unique Key3
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/31/2025
Sample typeQuality Control A brief description of the sample1 cubic foot
The quantity of what the sample constitutes1 cubic foot From where was the sample collectedFabricator
First name of sampler or witnessed byPatrick Last name of sampler or witnessed byBaddu
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameConFab Lathrop Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number98NV25AF
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected12960
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedBed 7, 4th Truck Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2025-07-31-3
DIME Test ID: 2025-07-31-3-6
Testing Lab: Con-Fab California Corporation - Lathrop
Test Method: CTM TEMP1-16: Test Method for Monitoring Precast Concrete Curing Temperature (Curing temperature)
Test Release Date: 2025-08-18

Test Results


Input Type: Calculated
Tester's full name: Patrick Wright
Date of test: 07/31/2025
Precast Maximum Curing Temperature: 148.5 °F
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 8/18/2025