Project Details
This page displays current information for project DEA: 033H5604.
Project Information
Project Identifiers | Project ID: 1000004 DEA: 033H5604 EFIS: 0318000014 |
---|---|
DIST-CO-RTE-PM | 03-PLA,NEV-20,80-VAR |
Award Date | 05/10/2024 |
Closeout Date | Not set |
Work Description | STRUCTURAL CONC, BAR REINFORCING STEEL, BRIDGE REMOVAL, HMA, AND JPCP. |
Location Description | PLACER AND NEVADA COUNTIES NEAR CISCO GROVE ON ROUTE 80 FROM 0.4 MILE WEST OF LAKE VALLEY OVERCROSSING TO 0.9 MILE EAST OF YUBA PASS SEPARATION AND OVERHEAD AND ON ROUTE 20 AT YUBA PASS SEPARATION AND OVERHEAD |
QA Service Level | 1 (Verified on 01/18/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
andrew.martin@dot.ca.gov | Andrew Martin | Resident Engineer | Caltrans RE DB |
jimmer.ross@dot.ca.gov | James 'Jimmer' Ross | Structural Representative | Caltrans SR DB |
justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Displaying 1-6 of 6 results.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | C&N Reinforcing (Dawnette Galicia) | 28241 LBS |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | C&N Reinforcing (Dawnette Galicia) | 4996 LBS |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | C&N Reinforcing (Dawnette Galicia) | 6264 LBS |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | C&N Reinforcing (Dawnette Galicia) | 16238 LBS |
EPD-191 | Carbon Steel Rebar | CMC - Durant | C&N Reinforcing (Dawnette Galicia) | 10690 LBS |
EPD-191 | Carbon Steel Rebar | CMC - Seguin | C&N Reinforcing (Dawnette Galicia) | 15391 LBS |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods