Summary for Test 2025-03-21-55-3
Test performed: CTM 504-June 2010Project Information
| Project Identifiers | Project ID: 994084 DEA: 060U8804 EFIS: 0616000074 |
|---|---|
| DIST-CO-RTE-PM | 06-TUL-99-26.3/27.6 |
| Award Date | 01/23/2023 |
| Closeout Date | Not set |
| Work Description | CONSTRUCT A NEW INTERCHANGE AT COMMERCIAL AVENUE NOW CALLED INTERNATIONAL AGRI-CENTER WAY |
| Location Description | ON STATE ROUTE 99 |
| QA Service Level | 1 (Verified on 03/13/2023) |
Sample Information
| Sample Taken Date | 03/21/2025 | Sample Unique Key | 55 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/21/2025 |
| Sample type | Quality Control | A brief description of the sample | 4x8 concrete cylinders |
| The quantity of what the sample constitutes | 5 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Ryan | Last name of sampler or witnessed by | Milum |
| Title of sampler | QC Field Technician | Telephone number of sampler | |
| Laboratory sample identification | Mix 185457, Set 7 | Linked DIME Sample ID | Unknown |
| The fabricator/manufacturer/facility name | CalPortland | Transportation Laboratory (TL) Number | Unknown |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | 00-0000 |
| Structure name | Abutment 1 | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 185457 |
|---|---|---|---|
| The truck number from where the sample was collected | Load 35 | The batch plant ticket number from where the sample was collected | 0 |
| Concrete batch plant | CalPortland Tulare | The fabricator/manufacturer designation for the sample | Set 7 |
| A detailed description of where the material sample was collected | Tulare Plant | Where the material sample would have been placed if not sampled | Unknown |
| From Lot No. | 1 | Bag Lot No. | 1 |
Test Details
DIME Sample ID: 2025-03-21-55
DIME Test ID: 2025-03-21-55-3
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2025-08-02
Test Results
Input Type: Calculated
Tester's full name: Ryan Milum
Date of test: 03/21/2025
Air Content: 1.6 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/2/2025 ✔
