Summary for Test 2024-11-12-61-3

Test performed: CTM 504-June 2010

Project Information

Project IdentifiersProject ID: 994654
DEA: 07313504
EFIS: 0715000090
DIST-CO-RTE-PM07-LA,VEN-1-37.7/62.9,0.0/0.9
Award Date07/20/2023
Closeout DateNot set
Work DescriptionREMOVE AND CONSTRUCT BRIDGE AND CULVERTS.
Location DescriptionLOS ANGELES AND VENTURA COUNTIES AT VARIOUS LOCATIONS FROM 0.4 MILE SOUTH OF TEMESCAL CANYON ROAD TO 0.1 MILE NORTH OF TONGA STREET
QA Service Level1 (Verified on 07/24/2023)

Sample Information

Sample Taken Date11/12/2024 Sample Unique Key61
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing11/13/2024
Sample typeQuality Control A brief description of the sample4x8 Concrete Cylinders
The quantity of what the sample constitutes9 From where was the sample collectedJob Site
First name of sampler or witnessed byDominique Last name of sampler or witnessed byMcGee
Title of samplerQC Field TEchnician Telephone number of sampler
Laboratory sample identificationMix ORSLBD50 Set 1 Linked DIME Sample ID
The fabricator/manufacturer/facility nameAssociated Ready Mix Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberORSLBD50
The truck number from where the sample was collectedLoad 4 The batch plant ticket number from where the sample was collectedUnknown
Concrete batch plant The fabricator/manufacturer designation for the sampleSet 1
A detailed description of where the material sample was collectedBridge Deck, STA 2922+65 Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2024-11-12-61
DIME Test ID: 2024-11-12-61-3
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2025-06-23

Test Results


Input Type: Calculated
Tester's full name: Dominique McGee
Date of test: 11/12/2024
Air Content: 2.5 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 6/23/2025