Summary for Test 2025-01-13-35-5

Test performed: CTM 217-June 2011

Project Information

Project IdentifiersProject ID: 994654
DEA: 07313504
EFIS: 0715000090
DIST-CO-RTE-PM07-LA,VEN-1-37.7/62.9,0.0/0.9
Award Date07/20/2023
Closeout DateNot set
Work DescriptionREMOVE AND CONSTRUCT BRIDGE AND CULVERTS.
Location DescriptionLOS ANGELES AND VENTURA COUNTIES AT VARIOUS LOCATIONS FROM 0.4 MILE SOUTH OF TEMESCAL CANYON ROAD TO 0.1 MILE NORTH OF TONGA STREET
QA Service Level1 (Verified on 07/24/2023)

Sample Information

Sample Taken Date01/13/2025 Sample Unique Key35
Date that the sample was received by the laboratory/organization performing the testing01/13/2025 Sample typeQuality Control
A brief description of the sample 1", 3/8, WCS The quantity of what the sample constitutes1 Bag
From where was the sample collectedJob Site First name of sampler or witnessed byDominique
Last name of sampler or witnessed byMcGee Title of samplerQC Field Technician
Telephone number of sampler Laboratory sample identificationSL675350CE
Linked DIME Sample IDUnknown The fabricator/manufacturer/facility nameAssociated Ready Mix
Transportation Laboratory (TL) NumberUnknown Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown
Structure unique identifier00-0000 Structure nameCIDH Pile 11
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-19-0046
The fabricator's/manufacturer's product name for the sampleSet 1 The fabricator/manufacturer designation for the sampleUnknown
The plant numberUnknown A detailed description of where the material sample was collectedFrom the Belt
Where the material sample would have been placed if not sampledUnknown Primary Aggregate Nominal Size1 inch
The concrete mix design numberSL675350CE Lot number1
Sublot number1 Aggregate Mix Number

Test Details

DIME Sample ID: 2025-01-13-35
DIME Test ID: 2025-01-13-35-5
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2025-07-24

Test Results


Number of tests: 1
Input Type: Calculated
Tester's full name: Julian Prieto
Date of test: 01/14/2025
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 0
Sand reading (test 1): 0
Sand equivalent (test 1): 81
Sand equivalent before temperature correction: 0
Sand equivalent after temperature correction: 81
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/24/2025 ✔