Summary for Test 2025-04-18-55-2

Test performed: CTM 504-June 2010

Project Information

Project IdentifiersProject ID: 994588
DEA: 081H3904
EFIS: 0817000032
DIST-CO-RTE-PM08-SBD-15-R20.5/R21.6,R25.5/R30.7
Award Date07/13/2023
Closeout DateNot set
Work DescriptionCONSTRUCT BUILDING, ROADWAY EXC, JPCP, AND TEMPORARY BARRIER SYSTEM.
Location DescriptionSAN BERNARDINO COUNTY FROM 0.6 MILE NORTH OF CLEGHORN ROAD UNDERCROSSING TO 0.5 MILE SOUTH OF ROUTE 138 AND FROM 0.5 MILE SOUTH OF TRUCK SAFETY CHECK AREA TO 0.4 MILE NORTH OF OAK HILL ROAD OVERCROSSING
QA Service Level1 (Verified on 08/02/2023)

Sample Information

Sample Taken Date04/18/2025 Sample Unique Key55
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/18/2025
Sample typeAcceptance A brief description of the sample#1-2 Fabricated @ 01:00am
The quantity of what the sample constitutes1 Set of 3 - 6X6X21 Rapid Set Concrete Beams From where was the sample collectedJob Site
First name of sampler or witnessed byZacarias Last name of sampler or witnessed byFlores
Title of sampler Telephone number of sampler
Laboratory sample identification1-2 Linked DIME Sample ID2025-04-18-54
The fabricator/manufacturer/facility nameSequoia Consultants Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberCTS-65-EHI
The truck number from where the sample was collected19 The batch plant ticket number from where the sample was collected9
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedBack of Concrete Truck Where the material sample would have been placed if not sampledSB Lane 4 Sta 752+90 - 752+45
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2025-04-18-55
DIME Test ID: 2025-04-18-55-2
Testing Lab: CT D08 - Fontana Field Testing Laboratory
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2025-05-20

Test Results


Input Type: Calculated
Tester's full name: Zacarias Flores
Date of test: 04/18/2025
Air Content: 1.5 %
General comments (publicly viewable) (Max 1000 characters): Set #1-2

Test was verified on 5/20/2025