Summary for Test 2025-04-30-44-5

Test performed: CTM 217-June 2011

Project Information

Project IdentifiersProject ID: 994084
DEA: 060U8804
EFIS: 0616000074
DIST-CO-RTE-PM06-TUL-99-26.3/27.6
Award Date01/23/2023
Closeout DateNot set
Work DescriptionCONSTRUCT A NEW INTERCHANGE AT COMMERCIAL AVENUE NOW CALLED INTERNATIONAL AGRI-CENTER WAY
Location DescriptionON STATE ROUTE 99
QA Service Level1 (Verified on 03/13/2023)

Sample Information

Sample Taken Date04/30/2025 Sample Unique Key44
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/30/2025
Sample typeQuality Assurance A brief description of the sampleConcrete Aggregates
The quantity of what the sample constitutes2 Bags From where was the sample collectedManufacturer
First name of sampler or witnessed byChris Last name of sampler or witnessed byElias
Title of samplerConsultant Tester Telephone number of sampler
Laboratory sample identification1st 300 CY Linked DIME Sample ID
The fabricator/manufacturer/facility nameCal Portland Farmersville Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-54-0022
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedBelt at Plant
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2025-04-30-44
DIME Test ID: 2025-04-30-44-5
Testing Lab: CT D06 - Visalia Field Laboratory
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2025-05-05

Test Results


Number of tests: 1
Input Type: Measured
Tester's full name: Chris Elias
Date of test: 04/30/2025
Temperature correction: 0
Temperature of solution: 77
Clay reading (test 1): 4.9
Sand reading (test 1): 3.8
Sand equivalent (test 1): 78
Sand equivalent before temperature correction: 78
Sand equivalent after temperature correction: 78
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 5/5/2025