Summary for Test 2025-04-23-53-2
Test performed: CTM 217-June 2011Project Information
| Project Identifiers | Project ID: 993331 DEA: 023H6904 EFIS: 0218000010 |
|---|---|
| DIST-CO-RTE-PM | 02-PLU-89-30/R42.1 |
| Award Date | 11/21/2024 |
| Closeout Date | Not set |
| Work Description | ALMANOR WEST REHAB - ROADWAY REHABILITATION |
| Location Description | IN PLUMAS COUNTY NEAR CANYON DAM FROM LAKE ALMANOR SPILLWAY TO ROUTE 36. |
| QA Service Level | 1 (Verified on 10/14/2021) |
Sample Information
| Sample Taken Date | 04/23/2025 | Sample Unique Key | 53 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 04/24/2025 | Sample type | Preliminary |
| A brief description of the sample | Class 2 AB | The quantity of what the sample constitutes | 3 Bags |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Dawn |
| Last name of sampler or witnessed by | Sloatermen | Title of sampler | TET |
| Telephone number of sampler | Laboratory sample identification | D79861 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Dig It Construction — Sierra Cascade Aggregate and Asphalt Products (Chester, CA) | |
| Transportation Laboratory (TL) Number | 857976 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-32-0008 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | Stockpile | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2025-04-23-53
DIME Test ID: 2025-04-23-53-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2025-05-05
Test Results
Number of tests: 3
Input Type: Measured
Tester's full name: Josh Murphy
Date of test: 04/30/2025
Temperature correction: 0
Temperature of solution: 21.5
Clay reading (test 1): 6.1
Sand reading (test 1): 4
Clay reading (test 2): 6.2
Sand reading (test 2): 4
Clay reading (test 3): 6.1
Sand reading (test 3): 4
Sand equivalent (test 1): 66
Sand equivalent (test 2): 65
Sand equivalent (test 3): 66
Sand equivalent before temperature correction: 66
Sand equivalent after temperature correction: 66
General comments (publicly viewable) (Max 1000 characters): SE=66
Test was verified on 5/5/2025 ✔
