Summary for Test 2025-03-26-64-2
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 994084 DEA: 060U8804 EFIS: 0616000074 |
|---|---|
| DIST-CO-RTE-PM | 06-TUL-99-26.3/27.6 |
| Award Date | 01/23/2023 |
| Closeout Date | Not set |
| Work Description | CONSTRUCT A NEW INTERCHANGE AT COMMERCIAL AVENUE NOW CALLED INTERNATIONAL AGRI-CENTER WAY |
| Location Description | ON STATE ROUTE 99 |
| QA Service Level | 1 (Verified on 03/13/2023) |
Sample Information
| Sample Taken Date | 03/26/2025 | Sample Unique Key | 64 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/26/2025 |
| Sample type | Quality Assurance | A brief description of the sample | HMA Type A |
| The quantity of what the sample constitutes | 10 Boxes 2 Bags 2 Cans | From where was the sample collected | Source |
| First name of sampler or witnessed by | Martika | Last name of sampler or witnessed by | Hall |
| Title of sampler | Plant Inspector | Telephone number of sampler | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Martin Marietta - Visalia | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | 1 |
| Sublot number | 44 | HMA Mix Number | |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2025-03-26-64
DIME Test ID: 2025-03-26-64-2
Testing Lab: CT D06 - Visalia Field Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2025-04-21
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Chris Elias
Date of test: 03/26/2025
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: 2024.7 g
Mass Loss: 107.0 g
Correction Factor (Percent by mass of HMA Specimen): 0.60 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.15 %
Test Temperature: 538 F
Corrected Asphalt Binder Content: 4.53 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 4/21/2025 ✔
